christieelementaryschoolOwner:  Plano ISD, Plano, Texas
Refrence:  Dusty Nugent – 972-971-3513
Architect: WRA Architects, Dallas, Texas
Completion: December 2015
Contract Amt:  $1,748,000.00
Contract Type:  CM at Risk
Description: 1,600 SF Kitchen Addition and 2,360 SF remodel of the existing Cafeteria

planoeastseniorhshealthscienceacademyOwner:  Plano ISD, Plano, Texas
Refrence:  Johnny Pechacek – 214-679-7844
Architect: WRA Architects, Dallas, Texas
Completion: August 2015
Contract Amt:  $6,425,118.00
Contract Type:  CM at Risk
Description: Renovate 32,000 s.f. of existing classroom space into new Health Science Classrooms and computer classrooms and construct a new 7,200 s.f. two story classroom addition.

14-07-29C CROPPED (800x600)Owner:  Covenant School of Dallas
Architect: SHM Architects, Dallas, Texas
Completion: August, 2014
Contract Amt:  $3,223,911.00
Contract Type:  CM at Risk
Description: SRC constructed a new 21,000 SF classroom building, which includes science labs and drama rooms.

 

Daugherty MainOwner:  Garland ISD, Garland, Texas
Architect: Corgan Associates, Dallas, Texas
Completion: August 2013
Contract Amt:  $14,180,336.00
Contract Type:  CM at Risk
Description: SRC constructed a new 97,000 SF elementary school to replace the existing facility. The two story structure features a central courtyard and many educational amenities including a shadow wall, sensory wall, and solar panels.

 

Patriot Cafe MainOwner:  Dallas Baptist University, Dallas, Texas
Architect: KTP Architects, Atlanta, Georgia/BMA Architects, Duncanville, Texas
Completion: August 2013
Contract Amt:  $327,667.00
Contract Type:  CM at Risk
Description: SRC remodeled a 1,500 SF kitchen and serving area that includes a Chick-Fil-A and Cocina de Mercado.

Republic Cafe MainOwner:  Dallas Baptist University, Dallas, Texas
Architect: BMA Architects, Duncanville, Texas
Completion: August 2013
Contract Amt:  $314,619.00
Contract Type:  CM at Risk
Description: SRC constructed a 7,300 SF shell space finish-out that includes a Papa John’s Pizza, Smoothie Bar, and dining and lounge areas.

BSRP3 MainOwner:  Dallas Baptist University, Dallas, Texas
Architect: BMA Architects, Duncanville, Texas
Completion: June, 2013
Contract Amt:  $2,953,451.00
Contract Type:  CM at Risk
Description: SRC constructed a 3-story, 22,000 SF building with 14,000 SF of residential space and 8,000 SF of classroom space.

Owner:  Plano ISD, Plano, Texas
Architect: VLK Architects, Fort Worth, Texas
Completion: August, 2011
Contract Amt:  $11,449,434.00
Contract Type:  CM at Risk
Description: SRC constructed a new 80,000 SF elementary school behind the existing school while classes were in session.  Once the new facility was occupied, the existing building was demolished.

Owner:  Plano ISD, Plano, Texas
Architect: SHW Group, Plano, Texas
Completion: August, 2011
Contract Amt:  $8,424,849.00
Contract Type:  CM at Risk
Description: SRC constructed two classroom additions totaling 24,000 SF as well as an extensive renovation of the existing building in phases while school was in session.

Owner: Plano ISD, Plano, Texas
Architect:  WRA Architects, Dallas, Texas
Completion:  August, 2009
Contract Amt:  $11,800,000.00
Contract Type:  CM at Risk
Description:  SRC constructed a new 65,500 SF elementary school with the demolition of the existing 59,500 SF facility.  A 6,400 SF portion of the existing facility was incorporated into the new building.

Owner:  Plano Independent School District,Plano, Texas
Architect:  SHW Group, Plano, Texas
Completed:  March, 2009
Contract Amt:  $9,264,071.00
Contract Type:  CM at Risk
Description:  SRC constructed a 5,000 SF classroom and restroom addition with a 68,000 SF complete renovation of the existing building.

Owner:  Midlothian I.S.D., Midlothian, Texas
Architect:  VLK Architects, Arlington, Texas
Completed:  September, 2008
Contract Amt:  $8,400,000.00
Contract Type:  CM at Risk
Description:  SRC constructed classroom, gymnasium, and choir additions as well as a renovation of the existing facilities.

Owner:  Dallas County Community College District, Dallas, Texas
Architect: Jacobs Facilities, Inc., Dallas, Texas
Completion: August, 2008
Contract Amt:  $7,602,700.00
Contract Type:  CM at Risk
Description: SRC constructed a 37,000 SF educational facility on a new satellite campus.

Owner:  Plano I.S.D., Plano, Texas
Architect:  Jacobs Facilities, Inc., Dallas, Texas
Completed:  January, 2008
Contract Amt:  $8,509,000.00
Contract Type:  CM at Risk
Description:  SRC constructed additions to the classrooms, kitchen, cafeteria, and administrative offices totaling approx. 23,000 SF and an extensive renovation of the 52,000 SF existing school building.

Project: Baxter Elementary School Additions and Renovations Midlothian, Texas
Owner: Midlothian I.S.D., Midlothian, Texas
Architect: VLK Architects, Arlington, Texas
Completed: August, 2007
Contract Amt:  $3,240,075.00
Contract Type:  CM at Risk
Description: SRC constructed two classroom additions totaling 12,000 SF and a 62,000 SF renovation to the existing facility.

Package: James Fannin Elem.,  School Maple Lawn Elem. and School Ben Milam Elem. School
Owner: Dallas I.S.D., Dallas, Texas
Architect: Shiver Associates Architects, Dallas, Texas
Completion Date: February, 2006
Contract Amount: $9,249,112.00
Contract Type: Stipulated Sum
Description: SRC constructed a 23,000 SF addition and completed a 68,000 SF renovation to Maple Lawn Elementary School. Also included was a 66,000 SF renovation to James Fannin Elementary School and 44,000 SF renovation to Ben Milam Elementary School

Owner: Plano I.S.D., Plano, Texas
Architect: Jacobs Facilities, Dallas, Texas
Completion: January 2007
Contract Amt: $9,194,422.00
Contract Type: CM at Risk
Description: SRC constructed a 28,000 SF two story science lab and a 6,500 SF band hall/team room addition as well as an 185,000 SF renovation. The renovation work was completed in stages during the summer and while class was in session.

Owner: Dallas I.S.D., Dallas, Texas
Architect: Hidell and Associates Architects, Carrollton, TX
Completed: August, 2006
Contract Amt: $9,922,232.00
Contract Type: Stipulated Sum
Description: SRC constructed a new 90,000 SF elementary school for Dallas ISD.

Owner: Plano I.S.D., Plano, Texas
Architect: Corgan Associates Architects, Dallas, Texas
Completion Date: October 2004
Contract Amount: $6,257,588.00
Contract Type: Stipulated Sum
Description: SRC constructed a 11,900 SF classroom addition and completed an extensive 53,500 SF renovation. The renovation work was completed in stages while class was in session.

Owner: Crowley I.S.D., Crowley, Texas
Architect: VLK Architects, Arlington, Texas
Completion Date: August 2004
Contract Amount: $7,154,300.00
Contract Type: Stipulated Sum
Description: SRC constructed a new elementary school with 68,000 SF including classrooms, gymnasium, library, kitchen, and cafeteria areas.

Owner: Cedar Hill I.S.D., Cedar Hill, Texas
Architect: BMA Architects, Duncanville, Texas
Completion Date: August 2002
Contract Amount: $5,968,100.00
Contract Type: Stipulated Sum
Description: SRC constructed a new elementary school with 68,000 SF including classrooms, gymnasium, library, kitchen, and cafeteria areas.

Owner: Cedar Hill I.S.D., Cedar Hill, Texas
Architect: BMA Architects, Duncanville, Texas
Completion Date: August 2002
Contract Amount: $5,779,300.00
Contract Type: Stipulated Sum
Description: SRC constructed a new intermediate school with 73,000 SF including classrooms, gymnasium, library, kitchen, and cafeteria areas.

Owner: Plano I.S.D., Plano, Texas
Architect: PBK Architects, Irving, Texas
Completion Date: May 2001
Contract Amount: $3,284,800.00
Contract Type: Stipulated Sum
Description: SRC constructed 25,500 SF of new construction that included classrooms and large group assembly areas to be utilized as a continuing education facility.

Owner: Plano I.S.D., Plano, Texas
Architect: VLK Architects, Arlington, Texas
Completion Date:
February 2000 (Stage 1)
August 2000 (Stage 2)
Contract Amount: $5,863,452.00
Contract Type: CM at Risk
Description: SRC constructed a 14,000 SF classroom addition (Stage 1); and constructed a 3,000 SF addition and completed an extensive 52,000 SF renovation (Stage 2). The renovation work was completed in stages while class was in session.

Owner: Scurry-Rosser I.S.D., Scurry, Texas
Architect: WRA Architects, Dallas, Texas
Completion Date: July 1999
Contract Amount: $1,580,000
Contract Type: CM at Risk
Description: SRC constructed a 26,000 SF gymnasium addition and a new band hall

Owner: Mesquite I.S.D., Mesquite, Texas
Architect: WRA Architects, Dallas, Texas
Completion Date: August 1999
Contract Amount: $6,783,800.00
Contract Type: Stipulated Sum
Description: SRC constructed a new elementary school with 66,000 SF including classrooms, gymnasium, library, kitchen, and cafeteria areas.

Owner: Plano I.S.D., Plano, Texas
Architect: VLK Architects, Arlington, Texas
Completion Date: September 1998
Contract Amount: $5,247,500.00
Contract Type: Stipulated Sum
Description: SRC constructed a 20,000 SF classroom addition and completed an extensive 58,000 SF renovation. The renovation work was completed in stages while class was in session.

Owner: Allen I.S.D., Allen, Texas
Architect: STB Architects, Dallas, Texas
Completion Date: August 1997
Contract Amount: $6,374,000.00
Contract Type: Stipulated Sum
Description: SRC constructed a new elementary school with 93,000 SF including classrooms, gymnasium, library, kitchen, and cafeteria areas.

Owner: City of Mesquite, Mesquite, Texas
Architect: WRA Architects, Dallas, Texas
Completion Date: February 1996
Contract Amount: $2,492,612.00
Contract Type: Stipulated Sum
Description: 25,500 SF of new construction that included classrooms and large group assembly areas to be utilized as a continuing education and training facility.

Owner: Mesquite I.S.D., Mesquite, Texas
Architect: STB Architects, Dallas, Texas
Completion Date: August 1995
Contract Amount: $725,100.00
Contract Type: Stipulated Sum
Description: SRC completed a 17,000 SF renovation that included classrooms and large group assembly areas to be utilized as a continuing education facility.

Owner: Mesquite I.S.D., Mesquite, Texas
Architect: WRA Architects, Dallas, Texas
Completion Date: August 1995
Contract Amount: $568,700.00
Contract Type: Stipulated Sum
Description: SRC completed a 5,400 SF education facility renovation.

Owner: Garland I.S.D., Mesquite, Texas
Architect: WRA Architects, Dallas, Texas
Completion Date: May 1995
Contract Amount: $2,498,000.00
Contract Type: Stipulated Sum
Description: SRC completed the structural concrete package, including floor slab and piers, for the 310,000 SF Rowlett High School.